XMETALL moved to new location that needed fixing up. We installed a runway for the crane through the entire factory and in order to install the door, we had to cut a 4x5m hole in the wall. We also constructed walls to separate our area from the rest. The total area is approximately 800 m2.
March 1, 2017

